A release announcement will be posted on PowerSchool Community when the installer is available for download. Refer to 2021 State Reporting Releases for release dates.
|
Reference |
Summary |
Release Note |
|---|---|---|
|
PSSR-265238 |
Clear the Effective Date and Grade Level Override Fields after Running EOY |
The Student’s "Effective Date" and "Grade Level Override" fields on the student’s state page enrollment tab are cleared when the End Of Year process is run. |
|
PSSR-262324 |
Retrieving the Uploaded Report Status from the DOE |
After uploading a report to the DOE, the status of the report can be retrieved from the DOE by clicking the Status button. |